FHA opposes Tenaska’s second methane gas-fired power plant and is working to stop it. Expedition would add another major pollution source beside an operating plant. Its effects would reach beyond neighboring properties through air pollution, water demand, construction traffic, and utility corridors.

​

​

 

 

 

 

 

 

 

 

 

 

 

 

Two plants with a combined burden

Residents would live with impacts from both plants. Expedition’s emissions would add to pollution from Tenaska’s existing Virginia Generating Station and other regional sources. Separate permits do not separate the air people breathe. FHA’s air and health research addresses those combined burdens; modeled health estimates describe potential impacts, not measured future illness.

Air and health research​

​

Major system redesign announced four months after county approval

 

In July, four months after county approval, Tenaska announced a major design change: switching Expedition from water cooling to air cooling. The change reduces projected operating water demand but introduces large cooling-fan banks, potentially as many as 60, raising questions about added noise for neighbors already living beside TVGS.

​

​

​

 

 

 

 

 

 

 

​

Illustrative example of air-cooled condenser fan banks, the type of cooling equipment proposed for Expedition. This image does not show Expedition’s final design or layout.

 

Dry cooling still uses water. Tenaska now projects average operating water use of approximately one million gallons a day, down from the earlier 6–7 million gallons under the wet-cooled design.

​

That reduction does not resolve construction demand, peak demand, or protections for private wells. FHA calls for documented water sources, baseline well testing, ongoing monitoring, and enforceable responsibility for correcting damage. The revised design also requires an assessment of noise from both plants operating together, including at night.

​

Tenaska’s water-use statements

 

The footprint extends beyond the plant

Before the county vote, Tenaska emphasized a 50-acre developed footprint on two parcels and access to existing utilities. But Expedition’s SCC application describes a 500-kV connection, switchyard, substation work, and supporting infrastructure. Pipelines, easements, access roads, and construction disturbance extend the project’s reach.

 

At the September 16 update, routes and the total disturbance remained unsettled.

​

Fluvanna’s zoning ordinance requires more than a plant acreage figure. Section 22-17-4 requires consideration of community character and neighboring property, along with a sketch plan of all proposed improvements. Section 22-17-16 requires the applicant to demonstrate protection of adjacent property and district character, preserve open space and buffers, and avoid creating or worsening traffic congestion. 

​

How could the Board adequately assess those protections while the infrastructure routes and extent of disturbance remained unresolved? FHA calls for a public accounting of the entire project’s footprint and compliance with county zoning protections.

 

Traffic and noise affect daily life

Traffic and noise reach beyond the plant. Fluvanna commissioned an independent TRC traffic study, yet the Board’s final conditions required fewer improvements than its consultant recommended and allowed construction to begin before intersection improvements were complete. FHA questions why Tenaska’s later traffic memo carried greater weight than the county’s own paid expert.

​

Construction traffic extends beyond commuting by as many as 800 workers. Concrete trucks, heavy equipment deliveries, and oversized loads would add congestion and road disruption. Residents deserve a complete accounting of those trips and protections in place before construction begins.

​

Neighbors of Tenaska’s existing plant have already sought relief from noise disturbances. They now face a second, larger plant beside the first, with large cooling-fan banks and nighttime operations that could compound the burden. Residents deserve relief from existing disturbances, an assessment of both plants operating together, and enforceable noise limits that protect their homes and sleep.​

 

County approval was not the last word

Fluvanna approved Expedition on March 18, 2026, despite its Planning Commission’s recommendation to deny the permit and significant community opposition. State approvals remain.

​

State regulators must address the major design changes, unresolved infrastructure and construction impacts, and combined burdens of two plants operating side by side. These issues must carry weight in their decisions.

​

FHA calls on state regulators to deny Expedition. Promised jobs and tax revenue do not erase the pollution, health risks, and disruption residents would bear.​

​